Our Approach
Six steps. No shortcuts.
A structured process designed around the realities of a yacht in operation — and around the people responsible for it.
01Process
From first enquiry to final record
Each step has a defined purpose, defined inputs and a defined outcome. Nothing moves to the next step until the previous one is complete.
- 01
Confidential Technical Enquiry
You describe the vessel, its engines and your objectives, through the private enquiry form or by telephone. Information is handled in confidence from the first exchange.
- Your input
- Engine manufacturer and model, number of engines, current rating, location, objectives.
- Our response
- A first exchange with our engineering team to clarify the context and the next step.
- 02
Engine Identification & Compatibility Review
We identify the exact engine reference, its rating and its control unit, and establish whether a calibration study is technically possible.
- Your input
- Engine plate data and, if available, control unit details or photographs of the identification plates.
- Outcome
- A clear answer: suitable for study, not suitable, or further information required.
- 03
Technical Assessment
Study of the engine's condition, maintenance history, operating profile and technical margins, together with cooling, transmission, propulsion and regulatory constraints.
- Involves
- Exchanges with the chief engineer, review of records and, where possible, operating data.
- Outcome
- An assessment of what may reasonably be pursued — and of what should not.
- 04
Tailored ECU Calibration Proposal
A written proposal specific to the vessel: objectives, method, planning, prerequisites, verification approach and a personalised quotation.
- Includes
- Scope, conditions to proceed, intervention planning and limits of the engagement.
- Decision
- Yours, with warranty and compatibility considerations set out in full.
- 05
Controlled Implementation
Intervention at the agreed time and place, coordinated with the captain and the engine department. The original calibration is archived before any change.
- Principles
- Planned around the vessel's programme. Work stops if the agreed conditions are not met.
- Engine room
- The chief engineer remains the authority over the machinery throughout.
- 06
Verification & Documentation
Post-calibration checks and validation in agreed operating conditions, using the diagnostic and measurement means available for the engine concerned. A written record of the work is handed over.
- Verification
- Methods set out in the proposal, according to the means available on board or at the facility.
- Record
- Engine identification, software references, work carried out and observations.
02Principles
Three rules that do not change
- 01
Study before intervention
No calibration is proposed before the engine and its environment have been assessed. A negative conclusion is a valid outcome.
- 02
Measure before stating
No figure is given in advance. Results are reported only once they have been measured and verified on the vessel.
- 03
Discretion by default
Vessel names, owners, locations and data are never published, and are shared only with those directly involved.
Private Enquiry
Request a Confidential Consultation
Share the essentials about the vessel and its engines. Your enquiry is reviewed by our engineering team and answered personally, in confidence.
Or by telephone: +33 6 12 92 52 18