R YachtingBy R Racing Engineering

Our Approach

Six steps. No shortcuts.

A structured process designed around the realities of a yacht in operation — and around the people responsible for it.

01Process

From first enquiry to final record

Each step has a defined purpose, defined inputs and a defined outcome. Nothing moves to the next step until the previous one is complete.

  1. 01

    Confidential Technical Enquiry

    You describe the vessel, its engines and your objectives, through the private enquiry form or by telephone. Information is handled in confidence from the first exchange.

    Your input
    Engine manufacturer and model, number of engines, current rating, location, objectives.
    Our response
    A first exchange with our engineering team to clarify the context and the next step.
  2. 02

    Engine Identification & Compatibility Review

    We identify the exact engine reference, its rating and its control unit, and establish whether a calibration study is technically possible.

    Your input
    Engine plate data and, if available, control unit details or photographs of the identification plates.
    Outcome
    A clear answer: suitable for study, not suitable, or further information required.
  3. 03

    Technical Assessment

    Study of the engine's condition, maintenance history, operating profile and technical margins, together with cooling, transmission, propulsion and regulatory constraints.

    Involves
    Exchanges with the chief engineer, review of records and, where possible, operating data.
    Outcome
    An assessment of what may reasonably be pursued — and of what should not.
  4. 04

    Tailored ECU Calibration Proposal

    A written proposal specific to the vessel: objectives, method, planning, prerequisites, verification approach and a personalised quotation.

    Includes
    Scope, conditions to proceed, intervention planning and limits of the engagement.
    Decision
    Yours, with warranty and compatibility considerations set out in full.
  5. 05

    Controlled Implementation

    Intervention at the agreed time and place, coordinated with the captain and the engine department. The original calibration is archived before any change.

    Principles
    Planned around the vessel's programme. Work stops if the agreed conditions are not met.
    Engine room
    The chief engineer remains the authority over the machinery throughout.
  6. 06

    Verification & Documentation

    Post-calibration checks and validation in agreed operating conditions, using the diagnostic and measurement means available for the engine concerned. A written record of the work is handed over.

    Verification
    Methods set out in the proposal, according to the means available on board or at the facility.
    Record
    Engine identification, software references, work carried out and observations.

02Principles

Three rules that do not change

  • 01

    Study before intervention

    No calibration is proposed before the engine and its environment have been assessed. A negative conclusion is a valid outcome.

  • 02

    Measure before stating

    No figure is given in advance. Results are reported only once they have been measured and verified on the vessel.

  • 03

    Discretion by default

    Vessel names, owners, locations and data are never published, and are shared only with those directly involved.

Private Enquiry

Request a Confidential Consultation

Share the essentials about the vessel and its engines. Your enquiry is reviewed by our engineering team and answered personally, in confidence.

Private Enquiry

Or by telephone: +33 6 12 92 52 18